GSA OASIS+ for Buyers: Scope, Domains and the Ordering Rules That Shape a Task Order

Yahia Aboushadi
Director of Brand and Marketing, Pyramid Systems
Reading time:
7 min.

Every GSA OASIS+ task order solicitation goes to one contract, one domain and one NAICS code, so the pool of offerors is fixed before a single proposal arrives. Scope works the same way: OASIS+ buys non-IT services, and information technology comes along only when the services need it. Both rules come from GSA's own Buyers' Guide, and both are easier to get right at the planning stage than to fix after posting.

What is GSA OASIS+?

OASIS+ (One Acquisition Solution for Integrated Services Plus) is a family of six governmentwide indefinite delivery, indefinite quantity (IDIQ) contracts for professional and other services. GSA calls it the largest governmentwide, multi-agency contract program for those services. It has no ceiling, a five-year base with one five-year option, and a designation from the Office of Management and Budget (OMB) as a preferred governmentwide solution.

The six contracts are Unrestricted, Total Small Business, 8(a), HUBZone, Service-Disabled Veteran-Owned Small Business and Women-Owned Small Business. Each is a distinct contract, not a lane inside one. OASIS+ combines the scope of legacy OASIS, Building Maintenance and Operations (BMO) and Human Capital and Training Solutions (HCaTS), and the Buyers' Guide says it supports any contract type at the order level, including cost-reimbursement, time-and-materials and hybrids, for work inside or outside the continental United States.

The pool keeps changing. GSA moved OASIS+ to continuously open solicitations, Washington Technology reported in January 2026, and GSA posted the first Phase II rolling award announcements on May 12, 2026. The contractor list on GSA's site is updated weekly, so market research from last quarter may be out of date.

Is IT in scope on OASIS+?

Only as a supporting piece. The Buyers' Guide says IT "is considered an ancillary support service or product" and may be included only when it is "integral and necessary to complete a total integrated solution." Non-IT services can include embedded IT, such as building controls or medical equipment where IT is part of how it works.

There is one carve-out that matters to defense and intelligence buyers. Equipment and services related to a national security system, as defined in 40 U.S.C. 11103(a), count as non-IT for OASIS+ purposes, and the Enterprise Solutions domain explicitly includes them.

In practice, a requirement whose principal purpose is software development, hosting or IT operations usually belongs on an IT vehicle. A program support, engineering or logistics effort that needs a reporting tool or some licenses along the way can fit OASIS+. Work whose principal purpose falls under FAR Part 36 (construction and architect-engineer contracts) is out of scope altogether. Where the line falls for a specific statement of work is the ordering contracting officer's call; GSA offers free, optional pre-solicitation scope reviews for exactly this question.

What are the OASIS+ domains?

Domains are groups of related services, each built from specific NAICS codes, and an order is competed within one domain. There are 13. The Buyers' Guide, in the revision dated May 12, 2026 that GSA's site carried on November 19, 2026, lists five of them as "currently unavailable for ordering."

Domain Ordering status in the Buyers' Guide Note
Management and Advisory Available Consulting and management support
Technical and Engineering Available Engineering and technical professional skills
Research and Development Available Basic and applied research, experimental development
Intelligence Services Available Command, control, communications, intelligence, surveillance and reconnaissance
Environmental Available Multidisciplinary environmental work
Facilities Available Building and real property operations
Logistics Available Movement of supplies, equipment or people
Enterprise Solutions Available, Unrestricted only Orders must be at least $250 million total estimated value
Business Administration Unavailable New domain
Financial Services Unavailable New domain
Human Capital Unavailable New domain
Marketing and Public Relations Unavailable New domain
Social Services Unavailable New domain

The $250 million minimum for Enterprise Solutions comes from Section C.2.5.1 of the Unrestricted contract and counts the base and all options. Before planning around one of the five new domains, check the award announcements, eBuy and eLibrary, which GSA says to watch for when ordering opens.

How do you place an order on OASIS+?

Start with a delegation of procurement authority (DPA). Only a warranted contracting officer can hold one, after OASIS+ DPA training (offered on demand as FAC 154) and a formal request to GSA. Contract specialists who complete the training can post solicitations in eBuy under a delegated contracting officer's direction. No DPA is needed for market research or requests for information, and OASIS+ orders still need acquisition planning and market research under FAR Parts 7 and 10. Our post on market research under FAR Part 10 covers what that file should show.

GSA eBuy is the mandatory and only system for task order and BPA solicitations. Each solicitation goes to one contract, one domain and one NAICS code, and every holder in that pool gets a fair opportunity unless a statutory exception applies. The guide prohibits sending the same requirement to OASIS+ Unrestricted and a small business contract at the same time, citing the fair notice requirement in 41 U.S.C. 3302(c)(2)(A).

Small business rules follow from the six-contract design. The Buyers' Guide says no further set-asides may be issued under any OASIS+ contract, and small business set-asides on the Unrestricted contract are explicitly prohibited. For 8(a), competitive orders go through the OASIS+ 8(a) contract at any dollar value, already accepted by the Small Business Administration (SBA); sole-source orders must each be offered to and accepted by SBA. Below the $5.5 million competitive threshold, the guide says the contracting officer must first try to compete the order and may award 8(a) sole source only if that does not succeed. For the set-aside contracts, a contractor's size and status default to what its master contract shows unless the contracting officer asks for recertification on a specific order.

The OASIS+ contract access fee

The contract access fee is a flat 0.15% of the total amount billed on each invoice, including ancillary items, travel and profit. The agency pays it and the contractor remits it to GSA. It goes on its own CLIN for the base and for each option period, set up as a flexibly reimbursable, no-fee line.

GSA says the fee "must never be treated as a negotiable element" between contractor and agency, that there are no agency agreements discounting it, and that it will give at least 60 days' notice before changing the rate. Contractors must carry the estimated fee in each proposal as a separate line based on the total estimated order value, which GSA says helps avoid funding issues.

Order length and BPAs

An order awarded before the master contract's ordering period ends can run up to five years and six months past that end, counting the FAR 52.217-8 extension. Option periods can be exercised after the master term expires as long as the order stays inside that limit. Orders covered by the Service Contract Labor Standards cannot have a base period longer than five years.

Blanket purchase agreements may be established on OASIS+ under FAR 16.507-2(c)(3) as rewritten in the FAR overhaul, and they cannot extend past the OASIS+ period of performance. For cost-reimbursement orders, the ordering contracting officer must confirm the contractor's accounting system is adequate before award, because OASIS+ holders were not required to prove that at the master contract level.

What to settle before you post in eBuy

Most of the rules above take effect before the solicitation goes out. A short pre-posting check:

  1. Confirm the principal purpose is a non-IT service, and request GSA's scope review if the IT share is large.
  2. Pick the contract track from the market research and the acquisition strategy, then one domain and one NAICS code that match the work.
  3. Check that the domain is open for ordering and, for Enterprise Solutions, that the estimate clears $250 million.
  4. Confirm the contracting officer holds an OASIS+ DPA and everyone posting in eBuy has taken the training.
  5. Add the contract access fee CLINs for the base and every option, and fund them for the life of the order.
  6. For cost-reimbursement, confirm accounting system adequacy and Cost Accounting Standards applicability before award.

Pyramid Systems holds an OASIS+ Unrestricted contract alongside our other prime contract vehicles. Whether OASIS+ is the right vehicle for a requirement is a decision for the contracting officer and the agency's acquisition team.

The Bottom Line

OASIS+ is built for large, mixed services requirements, and its structure decides a lot before evaluation starts: the contract track, the domain and the NAICS code fix the pool of offerors. Settle scope early, ask GSA for the free scope review, and leave the final call on vehicle choice to the contracting officer.

FAQ

Can I buy software development or cloud services on OASIS+?

Usually not as the primary purpose of the order. GSA's Buyers' Guide treats IT as ancillary and allows it only when it is integral and necessary to a total integrated solution, with an exception for services related to national security systems under 40 U.S.C. 11103(a), and it lists software development for those 11103(a) activities in scope. Whether a given requirement fits is the ordering contracting officer's decision, and GSA offers a free scope review to help.

Do I need a DPA to do market research on OASIS+?

GSA says no. A delegation of procurement authority is not needed to research the program or to issue requests for information in eBuy. It is required to solicit, evaluate, award or modify an order, and only a warranted contracting officer can hold one.

Can I set aside an order for small business on the OASIS+ Unrestricted contract?

No. The Buyers' Guide says no further set-asides may be issued under any OASIS+ contract and that small business set-aside solicitations under OASIS+ Unrestricted are explicitly prohibited. To compete among small businesses, the order goes to one of the five small business contracts instead.

Who pays the OASIS+ contract access fee?

The ordering agency pays it and the contractor remits it to GSA. It is 0.15% of the total amount billed on each invoice, on a separate CLIN for the base and each option period, and GSA gives at least 60 days' notice before any rate change.

Is OASIS+ still accepting new contractors?

Yes. GSA describes the solicitations as continuously open, and it posted the first Phase II rolling award announcements on May 12, 2026. GSA updates the contractor list weekly.

Sources

  1. GSA, OASIS+ Buyers' Guide (printable, revision date May 12, 2026)
  2. GSA, OASIS+ program page (last updated October 15, 2026)
  3. GSA, OASIS+ Fact Sheet (February 27, 2026)
  4. GSA, OASIS+ Resources
  5. Washington Technology, GSA re-opens OASIS+ to new bids, shifts to continuous approach (January 14, 2026)

How we researched this. Every number, date and requirement here is checked against the sources listed above, primary documents first, and the post is fact-checked again before publication. When a rule, date or status changes, we update the post and log the change below. Read our editorial standards or send a correction.

Yahia Aboushadi
About the author. Yahia Aboushadi is Director of Brand and Marketing at Pyramid Systems, an employee-owned federal IT firm in Fairfax, Virginia, that has delivered for federal agencies since 1995. . Connect on LinkedIn.

Continue reading

Related Insights

More from Pyramid Systems on federal AI and acquisition.

Two people at a gray table reviewing a printed form, one pointing at a line, with a pen and a tablet nearby

Acquisition

15 November 2026
Best Value Tradeoff vs LPTA, Plus the Third Approach the FAR Overhaul Named

Best value tradeoff vs LPTA under the rewritten FAR Part 15: the six civilian LPTA conditions, DoD's eight, the new highest technically rated approach and the file.

Read more
Source code on a monitor in a dark room, the kind of software that runs agentic AI in government

Federal AI

12 November 2026
Who Signs Off When an AI Agent Acts? Agentic AI in Government Under OMB, GSA and NIST

Agentic AI in government: what OMB M-25-21, GSA's AI clause and NIST's 10 agent identity tenets ask for when software acts, and where human approval belongs.

Read more
A person taking notes with a stylus at a dark desk, the kind of work FAR Part 10 market research asks agencies to document

Acquisition

08 November 2026
FAR Part 10 Market Research Under the Overhaul, and the Plan to Move It to Part 7

FAR Part 10 market research under the Revolutionary FAR Overhaul is now one short section, and a proposed rule would move it to FAR 7.2. What to document now.

Read more
A tall stack of hardbound books on a desk, the kind of reference shelf the FAR overhaul is rewriting

Acquisition

31 October 2026
Where the FAR Overhaul Stands: Deviations, Proposed Rules and FAR Companion 3.0

FAR Companion 3.0, agency class deviations and eight proposed rules: which one governs a buy under the FAR overhaul, and which parts still wait.

Read more